V3/4 parallel fuel rails4
#1
Scooby Regular
Thread Starter
iTrader: (3)
Join Date: Jan 2003
Location: Oss, The Netherlands
Posts: 749
Likes: 0
Received 0 Likes
on
0 Posts
V3/4 parallel fuel rails4
Setup consists of 2 Euro passenger rails (as they do not have the small pipe that runs from drivers side to the other rail) with -6AN fittings TIG welded on.
I used them for about 4 months,so the diy spraypaint is flaking (used no primer)
Asking 40 quid + shipping.
I used them for about 4 months,so the diy spraypaint is flaking (used no primer)
Asking 40 quid + shipping.
Thread
Thread Starter
Forum
Replies
Last Post
Mattybr5@MB Developments
Full Cars Breaking For Spares
28
28 December 2015 11:07 PM
Mattybr5@MB Developments
Full Cars Breaking For Spares
12
18 November 2015 07:03 AM