Notices
Non Scooby Related Anything Non-Scooby related

Oh bloody great, sub-station fire...

Thread Tools
 
Search this Thread
 
Old 20 November 2007, 04:32 PM
  #1  
Snazy
Scooby Regular
Thread Starter
 
Snazy's Avatar
 
Join Date: Dec 2006
Location: S.E London
Posts: 13,654
Likes: 0
Received 0 Likes on 0 Posts
Default Oh bloody great, sub-station fire...

... which for me equates to no electricity for when I get home.

They are usually good at rectifying things like this, but it sounds pretty bad, and appears to be a wide area affected.

So if you live in or near forest hill........ DONT GO HOME

Or if you are home already.... is it dark? Oh you cant see this can you, no power
Old 20 November 2007, 04:49 PM
  #2  
Brendan Hughes
Scooby Regular
 
Brendan Hughes's Avatar
 
Join Date: Oct 2000
Location: same time, different place
Posts: 11,313
Likes: 0
Received 4 Likes on 2 Posts
Default

Originally Posted by Snazy
Or if you are home already.... is it dark? Oh you cant see this can you, no power
Reminds me of the helpdesk call about the guy who says his screen's gone dark
Old 20 November 2007, 05:17 PM
  #3  
Snazy
Scooby Regular
Thread Starter
 
Snazy's Avatar
 
Join Date: Dec 2006
Location: S.E London
Posts: 13,654
Likes: 0
Received 0 Likes on 0 Posts
Default

Wooohoo, its sorted much sooner than expected. Question is, is the supply stable for the evening load!!
Old 20 November 2007, 05:33 PM
  #4  
Devildog
Scooby Regular
 
Devildog's Avatar
 
Join Date: Aug 2006
Location: Away from this place
Posts: 4,430
Likes: 0
Received 1 Like on 1 Post
Default

Originally Posted by Snazy
Wooohoo, its sorted much sooner than expected. Question is, is the supply stable for the evening load!!
Snazy aka Dr Frankenstein
Old 20 November 2007, 09:42 PM
  #5  
Snazy
Scooby Regular
Thread Starter
 
Snazy's Avatar
 
Join Date: Dec 2006
Location: S.E London
Posts: 13,654
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Devildog
Snazy aka Dr Frankenstein
lol you know me too well

Frankensnaz to be precise
Old 20 November 2007, 11:00 PM
  #6  
gazza-uk
Scooby Regular
 
gazza-uk's Avatar
 
Join Date: Jan 2006
Location: Yorkshire
Posts: 1,348
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Brendan Hughes
Reminds me of the helpdesk call about the guy who says his screen's gone dark
I still need to return that pc
Old 20 November 2007, 11:20 PM
  #7  
logiclee
Scooby Regular
 
logiclee's Avatar
 
Join Date: Sep 2000
Location: Notts, UK
Posts: 4,935
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Snazy
Wooohoo, its sorted much sooner than expected. Question is, is the supply stable for the evening load!!

Depends what they have had to do. It's unusual for a transformer to go but not unheard of. If it's a substation building fire it's usually the board that's blown.

Depends how much damage is done really.

We had the last 4 switches on the far end of this 11KV board blow this year. There wasnt much left of the last switch.


We managed to get the R/H (From the EMEB line) switches re closed whithin a few hours. The left hand side needed a thorough clean of the busbars and the last four switches debanking which took two days. It was a further month before the last switches were replaced but we were able to resupply them from the R/H side.

You are often left at risk due to maintenance and problems without you knowing.

Cheers
Lee
Old 21 November 2007, 09:06 AM
  #8  
Snazy
Scooby Regular
Thread Starter
 
Snazy's Avatar
 
Join Date: Dec 2006
Location: S.E London
Posts: 13,654
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by logiclee
Depends what they have had to do. It's unusual for a transformer to go but not unheard of. If it's a substation building fire it's usually the board that's blown.

Depends how much damage is done really.

We had the last 4 switches on the far end of this 11KV board blow this year. There wasnt much left of the last switch.


We managed to get the R/H (From the EMEB line) switches re closed whithin a few hours. The left hand side needed a thorough clean of the busbars and the last four switches debanking which took two days. It was a further month before the last switches were replaced but we were able to resupply them from the R/H side.

You are often left at risk due to maintenance and problems without you knowing.

Cheers
Lee

Wow, detail cheers mate
Got to be honest, I aint got a clue how all these things work, but nice to have an insight
Power was restored before I got home thankfully but the whole area near the substation was evacuated (I know how that feels) and sealed off.
Related Topics
Thread
Thread Starter
Forum
Replies
Last Post
Mattybr5@MB Developments
Full Cars Breaking For Spares
28
28 December 2015 11:07 PM
Mattybr5@MB Developments
Full Cars Breaking For Spares
12
18 November 2015 07:03 AM
buckerz69
Subaru Parts
7
08 October 2015 07:51 PM
FuZzBoM
Wheels, Tyres & Brakes
16
04 October 2015 09:49 PM
mart360
Non Scooby Related
9
29 September 2015 01:45 PM



Quick Reply: Oh bloody great, sub-station fire...



All times are GMT +1. The time now is 05:53 PM.