Thats a bargain
I did my prosport gauges on my type r in about 3 hours i think including beer breaks so something must of went wrong for them to charge 13 hrs labour???
JdcTypeR is offline  
Old 12 October 2010, 05:24 PM
  #32  
pimmo2000
Scooby Regular
iTrader: (6)
 
pimmo2000's Avatar
 
Join Date: Sep 2004
Location: On a small Island near France
Posts: 14,660
Received 4 Likes on 4 Posts
Default

baited the hook
pimmo2000 is offline  
Old 12 October 2010, 05:26 PM
  #33  
KAS35RSTI
Scooby Regular
iTrader: (73)
 
KAS35RSTI's Avatar
 
Join Date: May 2009
Location: 2.0 bar
Posts: 5,923
Received 10 Likes on 6 Posts
Default

Originally Posted by F11 SYS
hi there,would like to know if it is fair to be charged 13 hours labour to fit 3 gauges in a pod in a sti type r,please can you discuss this matter
How much labour does your guy charge to remove a engine?

13 hours is way too much mate.
KAS35RSTI is offline  
Old 12 October 2010, 06:05 PM
  #34  
Biggs
Scooby Regular
iTrader: (14)
 
Biggs's Avatar
 
Join Date: Aug 2005
Location: East Barnet/southgate on the borders of North London and Hertfordshire
Posts: 1,088
Likes: 0
Received 0 Likes on 0 Posts
Default

Perhaps they quoted you that time/money so that it would put you off. Not all garages want to work with these types of car.
Biggs is offline  
Old 12 October 2010, 06:22 PM
  #35  
Glowplug
Scooby Regular
iTrader: (8)
 
Glowplug's Avatar
 
Join Date: Jan 2008
Location: On The Road!
Posts: 5,027
Likes: 0
Received 0 Likes on 0 Posts
Default

Feel free to reply to some of the posts in your thread F11 SYS.

It's the orange button at the bottom, marked 'post reply'.
Glowplug is offline  
Old 12 October 2010, 06:58 PM
  #36  
djandyg
Scooby Regular
iTrader: (2)
 
djandyg's Avatar
 
Join Date: Feb 2010
Location: Colchester,Essex
Posts: 1,037
Likes: 0
Received 0 Likes on 0 Posts
Default

13 hours is ridiculous....

Thats over a day and a halfs labour for a garage.
djandyg is offline  
Old 12 October 2010, 08:41 PM
  #37  
dunx
Scooby Senior
iTrader: (3)
 
dunx's Avatar
 
Join Date: Jun 2006
Location: Slowly rebuilding the kit of bits into a car...
Posts: 14,333
Likes: 0
Received 0 Likes on 0 Posts
Default

If I REALLY disliked someone I would offer to charge them at those rates...

LOL

dunx

P.S. Even fitting five took me all morning, but two are just "stuck" ontop of the dash board.
dunx is offline  
Old 12 October 2010, 09:12 PM
  #38  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

it was power station that fitted the gauges,complete and utter rip offs!! 60 quid an hour plus vat. they machined a flanged,fixed a number plate bulb,swapped my brake discs around and changed brake fluid,fitted 3 gauges(oil temp,oil pressure,water temp) which i pre mounted into the pod but i didnt mount the pod to the dash board,i baught them the correct sandwich plate for these, the petrol cap needed a spring and my speedo wasnt working. they charged me £200 for parts including converter for the speedo,brake fluid,antifreeze,wires,plug and the grease on my *** when they raped me.23 half hours labour to do just this 5 hours work,they had the car for 2 weeks blaming the machineist,when i went to pick it up the speedo still wasnt working so had to leave it there and go back again,still wasnt fixed so just gave them a piece of my mind and came home with no money at all,skint,broke,robbed,raped,butchered etc etc worst of all im a **** for giving them the money!!!!!!!
F11 SYS is offline  
Old 12 October 2010, 09:21 PM
  #39  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default POWER STATION are cowboys 13 hors to fit 3 gauges

POWER STATION ARE RIP OFFS BEWARE!!! THEY CHARGED 13 HALF HOURS TO FIT 3 GAUGES(OIL TEMP,OIL PRESSURE,WATER TEMP),10 HOURS TO FIX A NUMBER PLATE BULB,PETROL CAP SPRING,CHANGE BRAKE DISCS AROUND,FIX SPEEDO AND MACHINE A FLANGE.5 HOURS WORK TOPS,£60 QUID AN HOUR.THEY BILLED ME 23 HALF HOUR LABOUR PLUS £200 QUID IN PARTS PLUS VAT
F11 SYS is offline  
Old 12 October 2010, 09:22 PM
  #40  
Myles
Scooby Regular
iTrader: (40)
 
Myles's Avatar
 
Join Date: Sep 2007
Location: Marlow, Bucks.
Posts: 6,106
Likes: 0
Received 0 Likes on 0 Posts
Default

13 hors, you cant call women that any more!!!
Myles is offline  
Old 12 October 2010, 09:24 PM
  #41  
G-string
Scooby Regular
iTrader: (1)
 
G-string's Avatar
 
Join Date: Nov 2008
Location: South Wales
Posts: 1,201
Likes: 0
Received 0 Likes on 0 Posts
Default

total rip off mate
G-string is offline  
Old 12 October 2010, 09:25 PM
  #42  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default 13 HOURS TO FIT 3 GAUGES

THE EXCUSE WAS THAT THEY ARE CHEAP GAUGES AND THEY TAKE LONGER,WHAT A LOAD OF COBBLERS THEY ALL HAVE WIRES AND SENSORS NO MATTER HOW EXPENSIVE
F11 SYS is offline  
Old 12 October 2010, 09:25 PM
  #43  
Curtis450
Scooby Regular
 
Curtis450's Avatar
 
Join Date: Jan 2010
Location: kidderminster west mids
Posts: 213
Likes: 0
Received 0 Likes on 0 Posts
Default

was going to take mine there but thought better of it when they said they cannot remap autronics.
Curtis450 is offline  
Old 12 October 2010, 09:28 PM
  #44  
jayallen
Scooby Regular
iTrader: (31)
 
jayallen's Avatar
 
Join Date: Jun 2006
Location: The Fabulist Hunter
Posts: 7,899
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by Myles
13 hors, you cant call women that any more!!!
I do on a reqular basis, my mrs quite likes it...
jayallen is offline  
Old 12 October 2010, 09:29 PM
  #45  
jayallen
Scooby Regular
iTrader: (31)
 
jayallen's Avatar
 
Join Date: Jun 2006
Location: The Fabulist Hunter
Posts: 7,899
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by F11 SYS
POWER STATION ARE RIP OFFS BEWARE!!! THEY CHARGED 13 HALF HOURS TO FIT 3 GAUGES(OIL TEMP,OIL PRESSURE,WATER TEMP),10 HOURS TO FIX A NUMBER PLATE BULB,PETROL CAP SPRING,CHANGE BRAKE DISCS AROUND,FIX SPEEDO AND MACHINE A FLANGE.5 HOURS WORK TOPS,£60 QUID AN HOUR.THEY BILLED ME 23 HALF HOUR LABOUR PLUS £200 QUID IN PARTS PLUS VAT
....and you paid it without dispute?
jayallen is offline  
Old 12 October 2010, 09:32 PM
  #46  
cookstar
Scooby Regular
iTrader: (6)
 
cookstar's Avatar
 
Join Date: Apr 2005
Location: Stroke it baby!
Posts: 33,828
Likes: 0
Received 0 Likes on 0 Posts
Default

cookstar is offline  
Old 12 October 2010, 09:34 PM
  #47  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

IM AN IDIOT I PAID BUT THAUGHT ABOUT IT AFTER,I TRUSTED THEM
F11 SYS is offline  
Old 12 October 2010, 09:35 PM
  #48  
m@t STImulation
Scooby Regular
iTrader: (3)
 
m@t STImulation's Avatar
 
Join Date: Apr 2009
Posts: 1,445
Likes: 0
Received 0 Likes on 0 Posts
Default

as above i would of told theme where to go is there something we are missing?

Have you talked to them b4 slagging them off??
mistake made?

it seems astronomical pricing to me
m@t STImulation is offline  
Old 12 October 2010, 09:36 PM
  #49  
m@t STImulation
Scooby Regular
iTrader: (3)
 
m@t STImulation's Avatar
 
Join Date: Apr 2009
Posts: 1,445
Likes: 0
Received 0 Likes on 0 Posts
Default

as above i would of told theme where to go is there something we are missing?

Have you talked to them b4 slagging them off??
mistake made?

it seems astronomical pricing to me
m@t STImulation is offline  
Old 12 October 2010, 09:37 PM
  #50  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

WHEN I SAT WITH MY FRIEND AND BROKE THE BILL DOWN I REALISED ID BEEN DONE FOR,I ASKED FOR SOME MONEY BACK BUT WAS REFUSED,IVE SPOKEN TO A SOLICITOR AND MY CASE IS STRONG AS EVERY TUNER I CONTACTED SAID IT WAS 5 HOURS WORK AT THE MOST AND THAT THEY ROBBED ME
F11 SYS is offline  
Old 12 October 2010, 09:38 PM
  #51  
Glowplug
Scooby Regular
iTrader: (8)
 
Glowplug's Avatar
 
Join Date: Jan 2008
Location: On The Road!
Posts: 5,027
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by F11 SYS
skint,broke,robbed,raped,butchered etc etc worst of all im a **** for giving them the money!!!!!!!
Agreed
Glowplug is offline  
Old 12 October 2010, 09:38 PM
  #52  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

MATE I PLEADED WITH HIM BUT HE SAID HIS DONE THE WORK,THE REASON HE GAVE FOR THE LENGTH OF LABOUR ON THE GAUGES WAS THAT THEY WERE CHEAP GAUGES
F11 SYS is offline  
Old 12 October 2010, 09:39 PM
  #53  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

I SUPPLIED A SANDWICH PLATE FOR THE SENSORS,HE SAID HE HAD TO TAKE THE DASH OUT TO PUT THE WIRES IN
F11 SYS is offline  
Old 12 October 2010, 09:42 PM
  #54  
Ian
Scooby Regular
iTrader: (10)
 
Ian's Avatar
 
Join Date: Jul 2005
Location: Cambridge
Posts: 7,845
Likes: 0
Received 1 Like on 1 Post
Default

dash out to fit gauges???

something isnt right there!!
Ian is offline  
Old 12 October 2010, 09:42 PM
  #55  
Curtis450
Scooby Regular
 
Curtis450's Avatar
 
Join Date: Jan 2010
Location: kidderminster west mids
Posts: 213
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by F11 SYS
I SUPPLIED A SANDWICH PLATE FOR THE SENSORS,HE SAID HE HAD TO TAKE THE DASH OUT TO PUT THE WIRES IN
LOL... not really needed but still not 13 hours work... why didn't you do it yourself its easy, case of wiring from sensor through some holes in engine bay into car and then to gauges.
Curtis450 is offline  
Old 12 October 2010, 09:43 PM
  #56  
jayallen
Scooby Regular
iTrader: (31)
 
jayallen's Avatar
 
Join Date: Jun 2006
Location: The Fabulist Hunter
Posts: 7,899
Likes: 0
Received 0 Likes on 0 Posts
Default

Cheap gauges or not, if they came with wiring diagrams it should of been a piece of p1ss.
jayallen is offline  
Old 12 October 2010, 09:48 PM
  #57  
gpssti4
Scooby Regular
iTrader: (6)
 
gpssti4's Avatar
 
Join Date: Nov 2004
Location: Deepest Darkest Kernow
Posts: 4,404
Likes: 0
Received 1 Like on 1 Post
Default

If that's all true I won't ever be considering Power Station again!
gpssti4 is offline  
Old 12 October 2010, 09:50 PM
  #58  
F11 SYS
Scooby Regular
Thread Starter
iTrader: (1)
 
F11 SYS's Avatar
 
Join Date: Oct 2010
Posts: 386
Likes: 0
Received 0 Likes on 0 Posts
Default

IF I HAD KNOWN THEY WERE GOING TO ROB ME I WOULDNT HAVE GONE THERE.I THAUGHT THEY WERE PROFESSIONALS!!!!
F11 SYS is offline  
Old 12 October 2010, 09:50 PM
  #59  
simon57
Scooby Regular
iTrader: (2)
 
simon57's Avatar
 
Join Date: Apr 2004
Location: And there was my scoob gone it was..
Posts: 2,914
Likes: 0
Received 0 Likes on 0 Posts
Default

Originally Posted by cookstar
Sorry mate should you not be on the ideal home web site...
simon57 is offline  
Old 12 October 2010, 10:01 PM
  #60  
Moley
Sponsor
iTrader: (9)
 
Moley's Avatar
 
Join Date: May 2004
Posts: 10,884
Received 24 Likes on 11 Posts
Default

3 threads complaining about them by you this evening

You're either very upset, or just joined up here to slag them off.... or both.
Moley is offline  


Quick Reply: 13 hours labour for 3 gauges



All times are GMT +1. The time now is 06:58 PM.