Compaq/HP Dual Input PDU PN?
#1
Scooby Regular
Thread Starter
Join Date: Nov 2001
Location: Leeds - It was 562.4bhp@28psi on Optimax, How much closer to 600 with race fuel and a bigger turbo?
Posts: 15,239
Likes: 0
Received 1 Like
on
1 Post
Anybody got the part number for the dual input PDU? (circa 16 IEC C14iirc outlets)
either that or a proper list of the PDU's availaible as HP's site is poo..
Im sure you can buy three phase PDU's
David
either that or a proper list of the PDU's availaible as HP's site is poo..
Im sure you can buy three phase PDU's
David
#3
Scooby Regular
Thread Starter
Join Date: Nov 2001
Location: Leeds - It was 562.4bhp@28psi on Optimax, How much closer to 600 with race fuel and a bigger turbo?
Posts: 15,239
Likes: 0
Received 1 Like
on
1 Post
Cheers Chris..
ftp://ftp.compaq.com/pub/products/servers/proliantstorage/power-protection/dualpdu-datasheet.pdf
191186-B31
Somehow suspect this is discontinued as it uses 12 C13 outlets and these have been replaced with the new modular pdu's..
Background is..
4 Cabinet's 1 or two pdu's per cabinet..
Server with redundant PSU's... not really planned when installed. (not me) so both PSU's plugged into same pdu same phase..
One PSU in a machine failed... the Main Breaker tripped in the distribution board.. Thus cutting 20Amps worth of power...
Thats around 10 servers..
Im just building a 10000 series rack.. with G3 DL380's
Only has 4 at the moment, however it has two modular pdu's one on the Red Phase.. and awaiting confirmation from HP / Compaq then the other will be supplied from a different cable / breaker / phase... possibly even a different 40kva Ups..
It will be stictly enfored that all servers must be cabled by this std..
If we cant go across phases then dual input.. but dual input will be better for servers with only one PSU, IE Proliant 1600R's and DL360's
David
ftp://ftp.compaq.com/pub/products/servers/proliantstorage/power-protection/dualpdu-datasheet.pdf
191186-B31
Somehow suspect this is discontinued as it uses 12 C13 outlets and these have been replaced with the new modular pdu's..
Background is..
4 Cabinet's 1 or two pdu's per cabinet..
Server with redundant PSU's... not really planned when installed. (not me) so both PSU's plugged into same pdu same phase..
One PSU in a machine failed... the Main Breaker tripped in the distribution board.. Thus cutting 20Amps worth of power...
Thats around 10 servers..
Im just building a 10000 series rack.. with G3 DL380's
Only has 4 at the moment, however it has two modular pdu's one on the Red Phase.. and awaiting confirmation from HP / Compaq then the other will be supplied from a different cable / breaker / phase... possibly even a different 40kva Ups..
It will be stictly enfored that all servers must be cabled by this std..
If we cant go across phases then dual input.. but dual input will be better for servers with only one PSU, IE Proliant 1600R's and DL360's
David