T26 WRC - Frayz Engineering WRC S8 TARMAC SPECIAL - aka THE BOMBER
Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Progress is progress...
I know these dont look like much at the moment. (a bit of imagination required on your part lol)
But these are my fuel rails in the making. The rails have already been machined. Now some nice 6mm billet brackets should fasten them down nice

I know these dont look like much at the moment. (a bit of imagination required on your part lol)
But these are my fuel rails in the making. The rails have already been machined. Now some nice 6mm billet brackets should fasten them down nice

Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Ross, the paint has been de vinyled and de glued. It has swirls and marks all over it but i will only mark it more whilst working on it. For that reason im waiting till the bulk of the mechanical work is finished and then i'll get it machine corrected before she goes back on the road. Hopefully that way, i wont mark it again
Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Brackets marked, drilled and checked for fitment. They fit perfect, so im quite pleased about that.
Brackets require trimming to suit and rails now marked and aligned for welding
Brackets require trimming to suit and rails now marked and aligned for welding

Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Cheers fella, as for the rotated pipes, Im making my own.
But they're taking time due to details i havent disclosed on the forums as of yet.
But they're taking time due to details i havent disclosed on the forums as of yet.
And what Headers you using?
Good Luck again
Last edited by STI_Baly; Apr 17, 2009 at 11:26 PM.
Unfortunately after a small burst of enthusiasm Frayz is now spending all his spare time flying a kite / buggy, with a view to competing.
So don't hold your breaths for completion of this project
So don't hold your breaths for completion of this project
Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Lol at you guys.
Yeah im competing with the kite buggy but work on the car is still happening as and when i get time.
Fuel rails are in for their final machining and almost complete.
Waiting on some items from the US to continue. Im in no rush guys, but the cogs are turning, dont worry
Yeah im competing with the kite buggy but work on the car is still happening as and when i get time.
Fuel rails are in for their final machining and almost complete.
Waiting on some items from the US to continue. Im in no rush guys, but the cogs are turning, dont worry
Thread Starter
Joined: Sep 2005
Posts: 19,945
Likes: 2
From: "Engineering Perfection in Essex"
Rails almost complete.
Just got to decide how im going to finish them. Might polish or brush etc. Dont know yet but the least of my worries.
Another job off of the list


Just got to decide how im going to finish them. Might polish or brush etc. Dont know yet but the least of my worries.
Another job off of the list

Brush
Knowing your love hate with flaps matey, saw these and thought of you. I noticed Ian has started making them.
Mini Mud Flaps Splash Guards Subaru Impreza Black x 4 on eBay, also, Subaru, Car Parts, Cars, Parts Vehicles (end time 31-May-09 13:24:57 BST)

Knowing your love hate with flaps matey, saw these and thought of you. I noticed Ian has started making them.
Mini Mud Flaps Splash Guards Subaru Impreza Black x 4 on eBay, also, Subaru, Car Parts, Cars, Parts Vehicles (end time 31-May-09 13:24:57 BST)



Not surprised you stripped it all out again.





