Exchange 5.5 & Schedule+ (yuk)
#1
Scooby Regular
Thread Starter
Got a bit of a problem, we've got an office with about 600 users running a mixture of the Exchange 5.0 client, Outlook 98, Outlook 2K and Outlook XP. I need to figure out which clients are running Schedule+ in order to get them migrated across to Outlook Calendars in preparation for the move to their new Exchange 2000 server.
It's easy enough to figure out that the Exchange 5.0 clients are running Schedule+ as their primary calendar, but more difficult to figure out which calendaring method the Outlook clients are using. Anyway of telling from the Exchange information store?
Or am I looking for a complicated solution? The office is in Germany hence a floorwalk (along with the fact that there are heaps of clients) is not really possible.
It's easy enough to figure out that the Exchange 5.0 clients are running Schedule+ as their primary calendar, but more difficult to figure out which calendaring method the Outlook clients are using. Anyway of telling from the Exchange information store?
Or am I looking for a complicated solution? The office is in Germany hence a floorwalk (along with the fact that there are heaps of clients) is not really possible.
#2
Not that I know of Miles. The only way I have done it before is to use one of the auditing software toolkits that install check and report on login..
I will be very interested if someone knows of a better way of doing this as I have a 150 user site to do very soon.
I will be very interested if someone knows of a better way of doing this as I have a 150 user site to do very soon.
Thread
Thread Starter
Forum
Replies
Last Post
Danny0608
Subaru
6
27 September 2015 02:16 PM
alcazar
Non Scooby Related
5
18 September 2015 11:49 PM