Jumbled posts
#1
Scooby Regular
Thread Starter
Join Date: Jul 2002
Location: Under your bonnet
Posts: 9,173
Likes: 0
Received 0 Likes
on
0 Posts
Jumbled posts
I can see what's happened and I would like it fixed because long technical posts are worthless unless continuity is kept.
Basically the old problem of editing ones post sometimes caused the date to be rearranged, ie 4th Jan became April 1st.
Now this in itself was not a problem on the old board (SN2) as the post stayed where it was in the running order but.....
Since SN3 came on line, it has read the date of each post and put them in Chronological order DING !!!!
Now the previously edited posts are all over the place and nothing is making sense.
You have my £25 please fix this bug.
If you want an eg, see This thread
The project started on 5th March but I seem to be fabricating an inter-cooler in February.... Note the give away (edited by Fuzz on 9/2/2003) at the bottom of what is a post that should be somewhere near the end of the project...
Andy.... Not amused
edited for good measure :P
Basically the old problem of editing ones post sometimes caused the date to be rearranged, ie 4th Jan became April 1st.
Now this in itself was not a problem on the old board (SN2) as the post stayed where it was in the running order but.....
Since SN3 came on line, it has read the date of each post and put them in Chronological order DING !!!!
Now the previously edited posts are all over the place and nothing is making sense.
You have my £25 please fix this bug.
If you want an eg, see This thread
The project started on 5th March but I seem to be fabricating an inter-cooler in February.... Note the give away (edited by Fuzz on 9/2/2003) at the bottom of what is a post that should be somewhere near the end of the project...
Andy.... Not amused
edited for good measure :P
Last edited by Fuzz; 06 February 2004 at 05:34 PM.