Project not the trend
#61
As always when i go to see the old girl I add on new work, so roof is coming off and carbon roof to go on and while the roof is off going to fit a Custom Cages cage cause I think she may try and kill me and I may just appear at a time attack round or maybe goodwood fos
think I've found my promo and show look to and yes its photoshopped before the police hit and no it not how the show fitment will be
think I've found my promo and show look to and yes its photoshopped before the police hit and no it not how the show fitment will be
#63
New intercooler has arrived and what a beast, subaru fitment but with a 5 inch core used in Rallycross cars and 1500bhp capacity. That should help, just need to figure out the co2 spray for it now
Should have the engine back next week and the special parts from america so time to build back up
Should have the engine back next week and the special parts from america so time to build back up
#65
Long time since last post, so the old girl has gone a new direction again.
The airride suspension has gone and going back to coilovers, all sound proofing is out, metal roof has gone, boot floor gone, full fia cage going in.
Will get some pics soon and post up
The airride suspension has gone and going back to coilovers, all sound proofing is out, metal roof has gone, boot floor gone, full fia cage going in.
Will get some pics soon and post up
#67
So its been a while, mainly waiting on parts and custom parts that seem to come from mars. After realising how the old girl might kill me it was time for safety so we went full fia cage plus some added bits, still not finished as we keep adding bits. All the tubular subframes are done and on and still using all my summit impreza linkages. Also the guys at Meister R came onboard and we are working on a new gc8 set up
We had to re think fuelling so after many emails to the us we went with a radium single to triple pump set up to be able to supply the feed for the 6x 2200cc injectors. Atl came on board with a endurance tank so we can have a little bit more go go juice.
The engine also went away again had lots of extras, uprated drag main caps, block girdle, head ported and polish, oversized bolts to hold it all together and every was super finished, a technic use in F1 to reduce any drag on crank and camshafts. Carbon roof and fibreglass dash on order. I got some more bits happening this week but will update as i go.
We had to re think fuelling so after many emails to the us we went with a radium single to triple pump set up to be able to supply the feed for the 6x 2200cc injectors. Atl came on board with a endurance tank so we can have a little bit more go go juice.
The engine also went away again had lots of extras, uprated drag main caps, block girdle, head ported and polish, oversized bolts to hold it all together and every was super finished, a technic use in F1 to reduce any drag on crank and camshafts. Carbon roof and fibreglass dash on order. I got some more bits happening this week but will update as i go.
Thread
Thread Starter
Forum
Replies
Last Post
Mattybr5@MB Developments
Full Cars Breaking For Spares
28
28 December 2015 11:07 PM
Mattybr5@MB Developments
Full Cars Breaking For Spares
12
18 November 2015 07:03 AM
Phil3822
General Technical
0
30 September 2015 06:29 PM