From what I can tell the 3" part will get covered by the standard centre. It's just that the original DP's end had fitted in the original centre in a kind of a ball joint with 2 spring bolts connecting the two.
Do I need this flexibility? Can I firmly join the 2 together? Cheers Mike |
No because they are 2 1/2" pipes
|
All times are GMT +1. The time now is 03:47 AM. |
© 2024 MH Sub I, LLC dba Internet Brands