dij
03 August 2004, 22:42
I have a phase 2 bare block,from a my99, with crank,rods, and 3 Cosworth forged pistons.
The 2nd cylinder will need re honing,as the #2 piston melted.
The big end,main,crankshaft,and pistons where replaced and the engine only lasted 1500 miles approx,(due to a fueling problem) so everything else is still good including the crank.
This would probably be suitable for someone thinking of rebuilding or upgrading an engine,as it could be done whilst the original is still in the car.
Lots of money was spent on the new parts so I would like to get something back but not expecting a big amount.I still have the receipts for the engine parts from Graham Goode racing.
Please make me an offer.
Thanks
The 2nd cylinder will need re honing,as the #2 piston melted.
The big end,main,crankshaft,and pistons where replaced and the engine only lasted 1500 miles approx,(due to a fueling problem) so everything else is still good including the crank.
This would probably be suitable for someone thinking of rebuilding or upgrading an engine,as it could be done whilst the original is still in the car.
Lots of money was spent on the new parts so I would like to get something back but not expecting a big amount.I still have the receipts for the engine parts from Graham Goode racing.
Please make me an offer.
Thanks